UPSC Prelims 2017 · CSAT (Paper 2) · Q16
Basic Numeracy
Medium · Rates puzzle
A spider climbs a pillar by climbing up 4m during the day and slipping back 1m each night. If the pillar is 15m tall, on which day will the spider first reach the top?
UPSC Prelims 2017 · CSAT (Paper 2) · Q16
Medium · Rates puzzle
A spider climbs a pillar by climbing up 4m during the day and slipping back 1m each night. If the pillar is 15m tall, on which day will the spider first reach the top?